Charles Guthrie
charlesguthrie58@yahoo.com
903-849-6007 (home)
903-515-0988 (mobile)
Chandler, Texas
Construction Manager / Commissioning & Integration
Technician
Kineticom
July 2013 to present
I am contracted to be a Construction Supervisor through General
Dynamics for the Ericsson LTE upgrade for AT&T in the New York market. My
duties are to insure the General Contractor performs all function of
installation of the LTE. The upgrade is as follows to install 3 antenna’s
with RRU’s and the Squid where the fiber and power lands, these are installed
on the tower. Inside the shelter I am responsible to insure that all the
equipment pertaining to the LTE are installed to the customers satisfaction .
This is to include all breakers,DC6, rectifiers GPS module, Power modules
Once all the equipment is installed correctly my duties are to do a NTP and
submit it to General Dynamics for the company to submit to AT&T, so
intern they can submit to Ericsson for them to move forward and install the
upgrade equipment. I also work with the tracker to make sure that General
Dynamics knows what needs to be done to get the site upgraded
Telecommunications Industry
July 2012– 2013
As a Construction Manager/ Commissioning & Integration
Technician I was contacted by WFI
to do there site surveys. Which consisted of me preforming
duties, as in showing WFI placement
of equipment, showing routes for power, Telco, Fiber(hybrid
cable),Laser shots, Took various
pictures to insure there was room enough for antenna placement,
equipment placement, and to
insure routing of cables. Took measurements of compound. Filled
in documents. To show that all
duties were performed. WFI felt that I was a good candidate to
send to school for
Commissioning and Integration, which resulted in getting my
Commissioning & Integration
Certification. My responsibilities were to control and insure
that GC's completed all tasks
assigned in a safe and timely manner. Manage the installation of
all flexi equipment, antenna's
,cat5 runs and installation of all cabling & conduit runs. I
managed the training and development
of subordinates on the task of commissioning and integration,
and then insured that all NSN / TMobile
Flexi equipment was installed, commissioned and integrated to
customer’s standard. I
completed all trackers, close out and call testing for site
completion for deliverables. I was laid
off, due to no work at this time.
Construction
Manager / Installer
Velocitel
August 2006 - June 2012 (6
years 10 months)
Installed ciena's 311 &
310 for Comcast. Did Link Validation on the 311, Tested with JDSU on the 310,
Took readings for db's
Preformed site walks for customer and Was in-charge of crews installing
conduit
for fiber for AT&T,
Motorola install of 4812 install RX-AIT equipment for AT&T. After
Roll-Out was
completed, went to School for
Velocitel Inc. and completed RF Hazard Awareness & Safety Training-
EME Hazard Awareness classes.
Then was sent out to do RF Readings and do drawings of buildings and
water towers. I also have
OSHA Certification. First Aid certified, Current U.S. Passport, and PTID
RX-AIT INSTALLER
AIC SYSTEMS
February 2006 - August 2006
(6 months) • Dallas, TX
Preformed Audits, Install
RX-AIT rack and populate rack. Ran all cables, Installed TDMA cables SMA
cables. Installed Fap then
power to all RX-AIT's then called Switch or NOC and cut site over. Also have
RF Card for doing RF Readings
Installer
AFL Telecommunications
September 2005 - October 2005
(1 months)
Was dispatched to Houston for
T-Mobile, & Nokia for Disaster Relief for Fema. Did damage control.
(Equipment) Install and
Software Upgrade at various Central Office and Cell Sites damaged caused by
Hurricane Katrina & Rita
Tech III Installer
S-Com
April 2004 - August 2005 (1
years 4 months) • Miami, FL
Central Office / DC Power
Installer / Cable Technician EXPERIENCE: 1/2005 S-Com Ran T-1's for BTS
Also used T-Berd Installed
Ericsson 2206 and 2106, Installed BYST's, Alarm cables, T1's, punched down
66 block for Alarms ,Power
Cables ,Ran Jumpers for Hard Lines, Ran Grounds and put on all lugs.
Industry:
Telecommunications/Wireless Technician III Installing Nokia equipment for T
mobile, Cingular
Consists of BYST'S, FXC
Cards, TRX(Radio's) BOA cards, SMA cables, Batteries, Rectifiers, T1'S and
Cat 5e. 911 Cables, ET2,
Internal and external jumpers, BB2 Cards and installing all Components for
Purcell. Removed Nokia
Equipment and Replaced with new BTS. Also preformed sweeps for external
jumpers
Education
Nokia Siemens Networks
PTID
Certification
2012 - 2012
Nokia Siemens Networks
PTID
Certification
2012 - 2012
OSHA
Vocational
2010 - 2010
Army
High School or equivalent
1971 - 1974
Ameri- Com
Certification
1999
Reference:
Boyce
Johns-----903-515-1396 Project Manager
Jonathon
Stuart-----810-990-5347 Project Manager
Fred
Bass----810-990-5347 Project Manager
Barry Lackner---248-705-4311 Project Manager